Quality
First articles measured on the CMM, in-process checks every tenth part and a traveler signed at every operation.
Quality
The report ships with the parts, not after them
Inspection starts before the first chip. Every job gets a control plan: which features are critical, how they are measured and how often. The inspector who signs the first article owns it for the life of the order.
Two CMMs sit in a temperature-controlled room next to the floor. Gauges are calibrated on a schedule, and the calibration list is checked at every audit.
Inspection steps
What happens to a part between the machine and the box
The same sequence runs on a one-off prototype and on a 4,000-piece lot. Only the sampling frequency changes.
| Step | What is checked | Record |
|---|---|---|
| Incoming material | Certificates, hardness and size against the order | Material cert in job file |
| First article | All drawing dimensions on the CMM plus visual and finish | FAI report, signed |
| In-process | Critical features every tenth part | Traveler sign-off |
| Final inspection | Drawing dimensions, threads, surface finish | Final report per lot |
| Packaging | Count, protection and labeling | Packing slip and photos |
Certifications
Programs we work inside
Certification labels drive which paperwork, traceability and data handling a job needs. Ask for the current certificates with your quote.
Template note: the certifications above are placeholder examples for a demo build. They are not a claim that this fictional shop holds a valid, current certification, and no certificate numbers are presented as real.
Send a drawing. Get a quote in 48 hours.
STEP, IGES, PDF or DXF with quantities and finish notes. An engineer reads every request, and the reply comes with assumptions and lead time spelled out.